Thursday, 27 August 2020
GPDO and UCO amendments under challenge
I am grateful to a correspondent for drawing to my attention an application for Judicial Review in respect of the recent amendments to both the General Permitted Development Order and the Use Classes Order. Solicitors acting for “Rights: Community: Action Ltd” [Keystone Law are not acting in this case] sent a letter before action to the Secretary of State on 21 August notifying him of the legal grounds of a proposed challenge to this subordinate legislation. If these Statutory Instruments are not withdrawn or suspended, the Claimant will challenge their lawfulness and will seek a declaration that the SIs are unlawful, and an order quashing them.
As someone who is strongly pro-European, I was pleased to see that one of the principal grounds of challenge is the government’s failure to comply with “the Strategic Environmental Assessment Directive” and the Environmental Assessment of Plans and Programmes Regulations 2004. The second ground of challenge is the government’s failure to comply with section 149 of the Equality Act 2010, which created “the public sector equality duty”. The potential claim is based, thirdly, on the government’s failure to take account of consultation responses and other material considerations, both by failing conscientiously to consider consultee responses and by failing to take into account the government’s own expert advice. Thus, it is alleged, in closing his mind to the issues raised regarding these proposed reforms, the Secretary of State adopted an approach which was unfair, inconsistent and/or irrational in the context of the approach taken to similar proposed reforms.
In their letter before action, the claimant’s solicitors require the Secretary of State to suspend the coming into effect of the SIs, pending the required SEA, impact assessments and Parliamentary debate. If he does not, the Claimant proposes to seek an urgent interim order suspending the operation of the SIs until the legal challenge is resolved.
I am led to understand that an application for leave, settled by leading and junior counsel in Landmark Chambers, has now been lodged in the High Court. At this stage, I am making no prediction as to whether permission to proceed will be granted by the High Court; and I certainly would not attempt to forecast the ultimate outcome of this litigation in the event that the claimant obtains the leave of the Court. I shall nevertheless follow the progress of the action with great interest.
© MARTIN H GOODALL
Ghastly extensions
I suppose I’d better summarise the remaining new PD rights for extensions to existing buildings that come into effect next week (on 31 August) although, as you may already have gathered, I am distinctly unenthusiastic about them, as are many other planning professionals. These new PD rights comprise Class AA in Part 1, and Classes AA, AB, AC and AD in Part 20 of the Second Schedule to the GPDO. They were introduced by The Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2020 (SI 2020 No.755).
[There have already had to be some corrections to the provisions to Class A of Part 20. I don’t propose to discuss these here. They can be found in Article 4(2) of the No.2 amendment order.]
In brief, the additional PD rights are as follows:
Part 1
AA - Construction of an extension of up to two extra storeys on an existing dwellinghouse comprising two storeys or more, or one extra storey on a bungalow.
Part 20
AA - Construction of up to two extra storeys of flats [number unspecified, and therefore apparently unlimited] immediately above existing premises that are not less than three storeys in height used within Use Classes A1* (shops), A2* (financial and professional services), Class A3* (restaurants and cafes), Class B1(a)* (offices) or as a betting office, pay day loan shop or launderette, or which are in mixed use as a dwellinghouse or dwellinghouses (Class C3) together with one of those uses. [*These commercial Use Classes continue to apply for the purposes of the GPDO, notwithstanding their abolition and replacement by Class E in the UCO.]
AB - Construction of up to two extra storeys of flats [number again unspecified, and therefore apparently unlimited] on an existing terrace building (i.e. a building which is not detached) of two or more storeys, used in the same way as described above, or one extra storey on such a building that currently comprises only one storey.
AC - Construction of up to two extra storeys of [an unspecified number of] flats above a single C3 dwellinghouse of two or more storeys in a terrace, or one extra storey on such a dwellinghouse that currently comprises only one storey in a terrace.
AD - Construction of up to two extra storeys of [an unspecified number of] flats above a single detached C3 dwellinghouse of two or more storeys, or one extra storey on such a dwellinghouse that currently comprises only one storey
In relation to the number of storeys, any floors below ground level and any existing loft conversion or roof extension must be excluded in counting the qualifying number of storeys for the purposes of Class 20. It follows from this that the existing accommodation in the roof must be counted as taking up one of the storeys permitted in the upward extension of the building.
In all cases in Part 20, the permitted development includes (within appropriate limits) necessary engineering operations, replacement or provision of plant, and the construction of storage, waste or other ancillary facilities.
However, before gung-ho building owners and developers start charging off in all directions with proposals for ugly and unneighbourly extensions, we should all be aware of the prohibitions that restrict the scope for such extensions.
Those applying to Class AA of Part 1 differ somewhat from the restrictions that apply under Class 20. The following is not a complete list of the prohibitions in paragraph AA.1 but, among these, development under Part 1, Class AA is not permitted :
- if the existing dwelling is situated within a Conservation Area, an Area of Outstanding Natural Beauty, the Broads, a National Park or a World Heritage Site (“Article 2(3) land”) or a Site of Special Scientific Interest (SSSI) [Note that, whilst in this case these prohibitions do not extend to a listed building or a building within its curtilage, the provisions of the Listed Buildings Act would nevertheless apply, and any such development would undoubtedly require Listed Building Consent, which in many cases it would be unlikely to get];
- if permission for its use as a dwellinghouse was granted only by virtue of Class M, N, O, P, PA or Q of Part 3;
- if it was constructed before 1st July 1948 or after 28th October 2018. The building must have been in its existing qualifying use on 5 March 2018,so if that use permanently ceased before that date, it does not qualify. [Note that “in use” in this context would, in my view, include a ‘dormant’ use, i.e. a use which was no longer active on that date, but in respect of which the existing use right for planning purposes had not been lost.];
- if, at any time following its original construction, the existing house has been enlarged by the addition of one or more storeys (whether with or without planning permission, or in reliance on PD under Class AA or otherwise)
There are also strict height limitations, which are too complicated to summarise here. The extension can only be built above the principal part of the dwellinghouse (i.e. the main part of the dwellinghouse excluding any front, side or rear extension of a lower height, whether this forms part of the original dwellinghouse or is a subsequent addition).
[This PD right is subject to a prior approval application first being made in respect of the matters listed in paragraph AA.2. I am not going discuss the details here, nor have I got time to run through the other conditions that apply.]
Development under Classes AA, AB, AC and AD of Part 20 is not permitted if the site is:
(i) article 2(3) land [see above];
(ii) a site of special scientific interest;
(iii) a listed building or land within its curtilage;
(iv) a scheduled monument or land within its curtilage;
(v) a safety hazard area;
(vi) a military explosives storage area; or
(vii) land within 3 kilometres of the perimeter of an aerodrome.
Development under these Classes is also precluded if the works exceed the permitted internal and external height limits, or if the permitted engineering operations exceed the specified limitations both as to their nature and as to their physical extent.
These PD rights are subject to strict conditions, the most important of which is the requirement to make a prior approval application. In addition to the ‘usual’ matters that may require prior approval (with which we have all become familiar under Part 3), other matters that will require attention include:
- the provision of adequate natural light in all habitable rooms of the new flats;
- impact on the amenity of the neighbouring premises including overlooking, privacy and the loss of light;
- whether, because of the siting of the building, the development will impact on a protected view identified in the Directions Relating to Protected Vistas dated 15th March 2012 issued by the Secretary of State,
also [in the case of Classes AA and AB only but not AC and AD]:
- impacts of noise from any commercial premises on the intended occupiers of the new flats;
- impacts of the introduction of, or an increase in, a residential use of premises in the area on the carrying on of any trade, business or other use of land in the area;
Any development under Classes AB, AC and AD is permitted subject to the condition that the development must not include a window in any wall or roof slope forming a side elevation of the building. In the case of Classes AC and AD, the materials used in any exterior work must also be of a similar appearance to those used in the construction of the exterior of the existing building and, following the development, the roof pitch of the principal part of the building must be the same as the roof pitch of the principal part of the existing building.
There is a condition that the development permitted must be completed within a period of 3 years starting with the date prior approval is granted. As in other cases, approval of construction management and methods will be required, including mitigation of construction noise, dust, vibration and traffic on occupiers of the building and adjoining owners or occupiers. Notice of completion of the development must also be given to the LPA by the developer. Following the development, every dwelling in the building must remain in use as a dwellinghouse within the meaning of Class C3 of the Schedule to the Use Classes Order and for no other purpose, except to the extent that the other purpose is ancillary to the primary use as a dwellinghouse.
The procedure for processing and determining the prior approval application is largely similar to the process that has become familiar over the past seven years. No time limit is stated in Part 20, but Article 7 provides that where no period is specified for the determination of the prior application, it is to be determined within a period of 8 weeks beginning with the day immediately following that on which the application is received by the authority, or within such longer period as may be agreed by the applicant and the authority in writing. However, in contrast with the provisions in Parts 1, 3, 6 and 16, there is no default provision that would entitle the developer to proceed with their development in the absence of determination within the 8-week period. The only remedy open to the applicant in these circumstances is an appeal against non-determination under section 78(2) of the 1990 Act.
I have deliberately confined this note to the main points, and have omitted some of the legislative detail. Readers should therefore refer to the actual text of SI 2020 No.755 for a complete picture of this legislation.
© MARTIN H GOODALL
Thursday, 6 August 2020
Wait and see
I am not getting excited about today’s publication of the Planning White Paper. Ignore all the overblown ministerial hyperbole and spin, and the overdramatic reactions that this has prompted. We shall need to read and digest the actual proposals, and try to understand what their real impact is likely to be.
There is a 12-week consultation period, which takes us to early November. The government must then, at the very least, go through the motions of considering responses. This will take another few weeks, although no doubt they will cut this down to the shortest interval they think they can get away with before ploughing on with their proposals regardless. The government will then have to introduce primary legislation to change the Development Plan system and to scrap and replace CIL with a nationally imposed development levy mechanism, not to mention various other changes to the 1990 Act. They will be doing well if they can introduce a Bill before the Christmas recess.
So we will be into the New Year before parliament gets to grips with the legislation. It is too early to say whether the Bill will wend its way through parliament in the usual manner or whether it will be fast-tracked in order to get to Royal Assent as fast as possible. This legislation may well prove to be controversial (even on the Tory backbenches), so the government may not get away with trying to railroad it through the legislature.
The bottom line is that it will be the Summer of 2021 before the dramatic changes the government is promising can actually be implemented. In practice, I foresee a potentially rough ride for the government over this, because they are going to get opposition not only from the usual suspects, but from their own supporters in Middle England (the stalwarts of the constituency Conservative Associations), which will feed through to concern on the Tory backbenches.
So, as the heading of this article says………… wait and see.
© MARTIN H GOODALL
Monday, 3 August 2020
Permitted development to demolish and replace buildings
As those readers who have been keeping up to date with the plethora of recent amendment orders and regulations will be aware, by 31 August we shall have (in the order in which they will appear on the printed page) the following Classes of permitted development in the recently introduced Part 20 of the Second Schedule to the GPDO - Class ZA, Class A, Class AA, Class AB, Class AC and Class AD. Then there is also the new Class AA in Part 1.
Today, I am going to focus solely on the last of these new PD rights to be introduced. This is Class ZA, which was brought into being by the Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 3) Order 2020 SI 2020 No.756, which was made on 20 July and will take effect on 31 August, at 10.00 a.m. precisely.
The development that will be permitted by Class ZA comprises two elements, the first of which encompasses the demolition of one or other of any building comprising a single purpose-built detached block of flats, or, alternatively a single detached building, comprising premises established for office use falling within Class B1(a), for research and development falling within Class B1(b) or for a light industrial process falling within Class B1(c) of the Schedule to the 1987 Order, or any combination of these three B1 uses. [To answer a point that one correspondent raised with me, “demolition” in this case must surely mean complete demolition of the entire building, bearing in mind the definition of “Building” in Article 2, to which I draw attention below.]
The second element of the development permitted comprises the construction of a purpose-built detached block of flats, or a single purpose-built detached dwellinghouse. (In either case, this means built as such and remaining as such.) For the purpose of carrying out this development, Class ZA permits operations reasonably necessary for the demolition and construction (which may include the installation of a basement or cellar in the new building, whether or not there is one in the old building) and works for the removal of plant servicing the old building, for the disconnection of services from the old building, for the removal of any means of access to the old building, for the removal of storage and waste from the old building, for the installation of plant to service the new building, for the installation of services to be connected to the new building, as well as works to enable access to and from the new building (including a fire escape), for the construction within the new building of storage, waste or other ancillary facilities to support the new building and the use of scaffolding and other temporary structures to support these operations (during a period starting with their installation no earlier than one month before the beginning of those operations, and ending with their removal no later than one month after the completion of those operations. [It occurs to me that one would not usually expect this level of detail to be required in a planning permission, so it is slightly puzzling that the draftsman of these provisions felt that it was necessary in this case.]
[It should be noted that this PD right does not confer any right to demolish a single detached dwellinghouse as such; and, although you can build a block of flats containing (in theory) an unlimited number of flats, you can in the alternative build only one detached dwellinghouse, even though there might potentially be room on the cleared site for several houses.]
The following definitions specifically applying to Class ZA should be borne in mind. First, this PD right applies only to a whole building and not to part only of a building (and the definition of a “building” in Article 2 has been changed to this effect so far as it applies to Class ZA). “Development” includes any change of use from the use of the old building to the use of the new building within Class C3 in the form in which this Use Class existed on 12 March 2020. [This is another provision which really ought not to have been necessary, as what is authorised is operational development, and so the use of the new building would in any event be governed by section 75 of the 1990 Act.] The “old building” and “new building” respectively mean the building proposed for demolition and the building proposed as replacement [another statement of the absolutely bl***ing obvious which was surely unnecessary], and “services” means water, drainage, electricity, gas, and other services to the extent reasonably necessary for the new building to function as a block of flats or as a single detached dwellinghouse. [Well, who’d have thought that’s what it meant?]
Some of the aspects of development not permitted by Class ZA represent in effect qualifying criteria which, if they are not met, take the development outside the scope of the GPDO. The old building must have been constructed before 1990, and it must still have been in existence on 12 March 2020. [“Built” is not defined, but I think we may take it that the old building must have been substantially completed (as per Sage) no later than 31 December 1989.] The footprint of the old building (i.e. the total area of ground covered by it) must not exceed 1,000 square metres, and the height of the highest part of the roof of the old building above ground level (not including plant, radio masts and antennae) must not be greater than 18 metres at any point.
[I am not sure what purpose is served by the requirement that the old building must still have been in existence on 12 March 2020. The PD rights under Class ZA must surely depend on the continued existence of the old building until prior approval has been granted. If the old building has already been demolished at a date after 12 March, is it implied that the right to erect a new building within the limits set in Class ZA can still be permitted development? I find it hard to believe that this is really what was intended. ]
One particularly important criterion is that the old building must have been vacant for a period of at least 6 months immediately prior to the date of the application for prior approval. However, if the old building has been rendered unsafe or otherwise uninhabitable by the action or inaction of any person having an interest in the land on which the old building stands, and if it would be practicable to secure safety or health by works of repair or works for affording temporary support, then this too is a disqualification. But keeping the old building vacant does not of itself count as action or inaction.
[The position regarding agricultural tenants is protected (see below), but there does not seem to be any other means of preventing the process of ‘winkling’ by unscrupulous landlords.
A correspondent has correctly raised with me how the LPA is to know, or be able to confirm that the building to be demolished has been vacant for at least six months, when there is no requirement for the applicant to supply any evidence to support this assertion (or assumption). How is the LPA to ascertain when it was vacated? I suppose rating records might be an indication. The same point could potentially arise with regard to the date of construction of the existing building. I think it would perhaps be slightly easier to ascertain whether the building had been completed no later than 31 December 1989. Building Control records should enable this to be confirmed.]
The footprint of the new building (defined as mentioned above) must fall wholly within the footprint of the old building. Development is disqualified if any part of the footprint of the new building falls outside those limits. Furthermore, no part of any exterior wall of the new building must be nearer the highway than any exterior wall of the old building.
The new building must not have more than two storeys more than the old building. Where the new building has additional storeys compared with the previous building the floor to ceiling height of any additional storey in the new building, measured internally, must not at any point be greater than whichever is the lower of the floor to ceiling height, measured internally, of any storey in the old building, or 3 metres.
There is also an overall limit on the height of the new building; it must not exceed whichever is the lower of 7 metres above the height (not including plant) of old building, or 18 metres in total, although plant, radio masts and antennae on the new building can be left out of account for this purpose. The height of any plant on the roof of the new building as measured from the lowest surface of that roof must not be greater than the height of any existing plant as measured from the lowest surface of the existing roof on the principal part of the old building.
There are, of course, various other prohibitions (as you would expect if you are already familiar with similar PD rights elsewhere in the GPDO). Development is not permitted by Class ZA if land covered by, or within the curtilage of, the old building is occupied in any part under an agricultural tenancy (unless the express consent of both the landlord and the tenant has been obtained). It is not permitted if it is or forms part of a Conservation Area, an AONB, the Broads, a National Park or a World Heritage Site [Article 2(3) land, which also includes land specified for the purposes of section 41(3) of the Wildlife and Countryside Act 1981 – no, me neither].
Bearing in mind the disqualification of a building situated within a Conservation Area, it is not clear why the draftsman should also have thought it necessary to prohibit the demolition of an unlisted building in a conservation area (“relevant demolition” for the purposes of section 196D of the Listed Buildings Act).
Development under Class ZA is also prohibited if the site is or forms part of a Site of Special Scientific Interest, of a listed building or land within its curtilage, of a scheduled monument or land within its curtilage or if it is or forms part of a safety hazard area or military explosives storage area, or is within 3 kilometres of the perimeter of an aerodrome.
All this is, of course, subject to a condition requiring a prior approval application to be made before any of this development commences. The matters requiring prior approval in this case are:
(a) transport and highways impacts of the development;
(b) contamination risks in relation to the new building;
(c) flooding risks in relation to the new building;
(d) the design of the new building;
(e) the external appearance of the new building;
(f) the provision of adequate natural light in all habitable rooms of each new dwelling in or comprising the new building;
(g) the impact of the development on the amenity of the new building and of neighbouring premises, including overlooking, privacy and light;
(h) impacts of noise from any commercial premises on the intended occupiers of the new dwellings;
(i) the impact on business and new residents of the development’s introduction of, or increase in, residential use in the area in which the development is to take place;
(j) the impact of the development on heritage and archaeology (which obliges the LPA, so far as they consider reasonably practicable, to consult any bodies that they consider to have heritage and archaeological expertise relevant to their functions under Part 3 of the Act and the GPDO);
(k) the method of demolition of the old building;
(l) the plans for landscaping of the development, including the planting and maintenance of shrubs and trees; and
(m) any air traffic and defence asset impacts of the development, and any impact that, because of the siting of the new building, the development will have on a protected vista identified in the Directions Relating to Protected Vistas dated 15 March 2012 by the Secretary of State, unless no part of the new building (including plant, radio masts and antennae) occupies airspace not occupied by the old building (including plant, radio masts and antennae).
[The matters requiring prior approval still do not specifically include the adequacy of the residential accommodation in terms of the floor area of each dwelling, room sizes, etc. but ”the impact of the development on the amenity of the new building and of neighbouring premises, including overlooking, privacy and light” does for the first time introduce some additional elements of residential amenity into the equation, although only practical experience of the operation of these provisions will show to what extent this might be stretched to embrace such considerations as the adequacy of the new residential accommodation (in terms of size, servicing arrangements and any outside space, etc.).]
The term “commercial premises” (in sub-paragraph (h)) means any premises in the surrounding area which are normally used for the purpose of any commercial or industrial undertaking which existed on the date of the prior approval application under, and includes premises licensed under the Licensing Act 2003 or any other place of public entertainment. I won’t repeat other definitions of terms that were explained in my last blog post, such as “air traffic and defence assets”.
Some additional requirements have been added to Part 20 regarding the information to be provided with a prior approval application under Class ZA. (In a Class ZA application, this list replaces the list of requirements that apply to other developments under Part 20.) The complete list of items required under Class ZA comprises:
(a) a written description of the proposed development, which must include details of the building proposed for demolition, the building proposed as replacement and all of the operations listed above (for both the demolition and the new build, all services, plant, etc.);
(b) a plan, drawn to an identified scale and showing the direction of North, indicating the site of the proposed development;
(c) drawings prepared to an identified scale and showing external dimensions and elevations of the building proposed for demolition and of the building scheduled as replacement, showing the direction of North and the positioning of each, together with the applicable information mentioned below**;
(d) a written statement specifying the number of dwellings in the building proposed for demolition, and the number of new dwellings proposed in the building proposed as replacement;
(e) where there is a requirement for the Environment Agency to be consulted (in Flood Zones 2 or 3, or in an area within Flood Zone 1 which has critical drainage problems and which has been notified to the local planning authority by the Environment Agency), a site-specific flood risk assessment;
(f) a written statement in respect of heritage and archaeological considerations of the development;
(g) the developer’s contact address; and
(h) the developer’s email address if the developer is content to receive communications electronically;
This information must of course be accompanied by any fee required to be paid. (To avoid unnecessary repetition, I would remind you of the much increased fees that will be payable in respect of applications under Class 20, which I explained in this blog on Wednesday, 15 July, when I drew attention to draft amendment regulations to the Fees Regs. So far as I am aware, these still remain only in draft at the time of writing , and it is uncertain whether the new scale of charges will have come into force by 1 September.)
**The information referred to in sub-paragraph (c) above, which must so far as practicable show the direction of North and also elevations is —
(a) where the building proposed as replacement is a block of flats, the position and dimensions of windows, doors and walls in the block and in each flat in the new block, and the dimensions and use of all habitable and other rooms in each flat;
(b) where the building proposed as replacement is a single house, the position and dimensions of the windows, doors and walls in it, and the dimensions and use of all habitable and other rooms in it.
The following further conditions also apply to the development:
When the developer makes the prior approval application, the procedure for dealing with such applications under Part 20 (as set out in paragraph B of that Part) applies to the application.
Before beginning the development, the developer must provide the LPA with a report for the management of the construction of the development, which is acceptable to the authority and sets out the method of demolition, the proposed development hours of operation and how any adverse impact of noise, dust and vibration and traffic on occupiers of the new building and adjoining owners or occupiers will be mitigated, the proposed use of materials, and the plans for the disposal and recycling of waste generated by the development and that in carrying out the development the developer must comply with the report.
The development must be completed within a period of 3 years starting with the date prior approval is granted, and the developer must notify the LPA of the completion of the development as soon as reasonably practicable after completion. This notification must be in writing [which can include an email] and must include—
(a) the name of the developer;
(b) the address or location of the development; and
(c) the date of completion.
[In accordance with Article 7, the prior approval application should be determined by the LPA within 8 weeks. However, there is no right to proceed with the development in default of a determination within that period. So what has become known as “the 56-day rule” has no application here. The only remedy for non-determination within a reasonable time is an appeal under section 78(2)(a) of the 1990 Act.]
Any new dwelling created under Class ZA is to remain in use as a dwellinghouse within Use Class C3 and for no other purpose, except to the extent that the other purpose is ancillary to the primary use as a dwellinghouse.
[I am aware that there are multiple issues that this new PD right throws up, some of which have been raised by correspondents in response to other recent blog posts. There is, for example, no reference anywhere in Class ZA to ‘curtilage’. So, if a curtilage is to be provided this would require a separate planning permission.
There is no distinction between development in urban areas and development in rural areas. As one correspondent has pointed out, this could raise a number of issues, including scale and rural impact, which the prior approval application process does not adequately address. However, the restriction of the types of building that can be demolished to buildings in use under Class B1 or purpose-built blocks of flats does perhaps limit the scope for this type of development in the open countryside.
Like quite a few other planning professionals, I am sceptical as to the contribution that permitted development under the various Classes in Part 20 will make to the overall housing requirement. If you add together all the developments that might come forward, I doubt whether they would amount to even 1% of the annual requirement, whilst the other 99% will still have to be found through more orthodox forms of development.]
© MARTIN H GOODALL
Wednesday, 22 July 2020
Use Classes Order - “All change, please.”
The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 (SI 2020 No.757), which were made on 20 July and take effect on 1 September 2020, make important changes to the already much amended 1987 Use Classes Order. The changes are quite complex, because of the need to take account of various knock-on effects and the consequent requirement to include various transitional provisions to ensure a reasonably smooth move to the new and revised Use Classes.
Parts A and D of the original Schedule to the UCO are entirely revoked, which puts an end to Use Classes A1, A2, A3, A4 and A5, and Classes D1 and D2. These are replaced by new Use Classes in Schedule 2, except for those listed below that have now become sui generis uses. Class B1 is also abolished as a separate Use Class, and is also subsumed within a new Use Class in Schedule 2. Use Class B2 remains in what is now Schedule 1, in an amended form. Rather than discussing these changes piecemeal, I will summarise the new, revised and surviving Use Classes below.
Several of the uses previously within specified Use Classes have now been added to the list of sui generis uses set out in Article 3(6). These are uses:
(p) as a public house, wine bar, or drinking establishment [formerly A4],
(q) as a drinking establishment with expanded food provision [which fell awkwardly between A4 and A3],
(r) as a hot food takeaway for the sale of hot food where consumption of that food is mostly undertaken off the premises [formerly A5]
(s) as a venue for live music performance [formerly within D2, and possibly also an ancillary use in some cases within other Use Classes],
(t) a cinema [formerly D2(a)],
(u) a concert hall [formerly D2(b)],
(v) a bingo hall [formerly D2(c)],
(x) a dance hall [formerly D2(d)].
[This has a number of potential consequences. First, where several of these uses fell under one and the same Use Class in the previous version of the UCO (such as, for example, a cinema, a concert hall, a bingo hall or a dance hall - all of which fell within Use Class D2) a change of use between any of those uses would not have been development.
Now that each of these uses is a sui generis use, a change of use from one of these uses to another use, even though it was formerly within the same Use Class will now constitute development, and will require planning permission. However, these changes do not take effect until 1 September, and so (at the time of writing) there is a five-week period in which somebody wishing to make a change of use from, say, a cinema to a bingo hall can still do so without requiring planning permission. However, it might be advisable to preserve dated documentary and photographic evidence of the change of use, and even possibly to exhibit that material to a statutory declaration recording the change of use, in order to counter any allegation in future that the change of use required planning permission and was therefore a breach of planning control. After 31 August, however, it will no longer be possible to make such changes of use without planning permission (unless they are permitted by the GPDO).
The effect that this and the other changes described below may have on permitted development under the GPDO is covered (at least for the next year) by a saving provision which I will explain later in this note.]
The former Schedule to the UCO (now SCHEDULE 1) contains the following Use Classes:
PART B
Class B2. General industrial
Use for the carrying on of an industrial process other than one falling within the uses described in Schedule 2, Class E, sub-paragraph (g).
Class B8. Storage or distribution
Use for storage or as a distribution centre.
PART C
[This part is not affected by the amendment regulations, and so does not require further summary here. Use Classes C1, C2, C2A, C3 and C4 therefore continue unchanged.]
The new SCHEDULE 2 contains the following Use Classes:
PART A (Commercial, Business and Service)
Class E. Commercial, Business and Service
Use, or part use, for all or any of the following purposes—
(a) for the display or retail sale of goods, other than hot food, principally to visiting members of the public [formerly A1],
(b) for the sale of food and drink principally to visiting members of the public where consumption of that food and drink is mostly undertaken on the premises [formerly A3],
(c) for the provision of the following kinds of services principally to visiting members of the public [all formerly within A2] —
(i) financial services,
(ii) professional services (other than health or medical services), or
(iii) any other services which it is appropriate to provide in a commercial, business or service locality,
(d) for indoor sport, recreation or fitness, not involving motorised vehicles or firearms, principally to visiting members of the public [formerly within D2(e)].
[Although this new Use Class makes no mention of a gymnasium, the phrase “indoor sport, recreation or fitness” would appear to be wide enough to embrace such a use, which has not been specifically added to the list of sui generis uses in Article 3(6). Similarly, although swimming baths and skating rinks are specifically included in Use Class F, this use would also appear to be capable of falling within new Use Class E (under paragraph E(d)), because there is no provision that excludes the use in new Class F.2 from alternatively falling within Class E. As with several other queries of this nature, I have not yet understood the ramifications of this apparent confusion.]
(e) for the provision of medical or health services, principally to visiting members of the public, except the use of premises attached to the residence of the consultant or practitioner [formerly D1(a)],
[I cannot see why there is a need to distinguish between E(c)(ii) (which does not include health or medical services) and E(e), which comprises those services, when both are now in one and the same Use Class (Class E).]
(f) for a crèche, day nursery or day centre, not including a residential use, principally to visiting members of the public [formerly D1(b)],
(g) for—
(i) an office to carry out any operational or administrative functions [formerly B1(a)],
(ii) the research and development of products or processes [formerly B1 (b)], or
(iii) any industrial process [formerly B1(c)],
- being a use [in all three cases, as in the former Class B1] which can be carried out in any residential area without detriment to the amenity of that area by reason of noise, vibration, smell, fumes, smoke, soot, ash, dust or grit.
[One potentially problematic change is that the list of other uses that were formerly included in Use Class A1 (shops) are omitted. Without that listing, quite a few of those uses would not have come within the A1 Use Class, because they did not comprise or include (except as a purely ancillary use in some cases) the retail sale of goods. They included (among other uses) use as a post office, a travel or ticket agency, hairdressing, a funeral business, or a hire shop.
The new Use Class E does include “any other services which it is appropriate to provide in a commercial, business or service locality”, and it may be that all the uses formerly listed in Use Class A1 would now come within this category. If so, the new Use Class could be even wider than the Use Classes that it replaces, and might well embrace other services that one might reasonably expect to find in a commercial, business or service locality. These could include, for example, a nail bar, a tattoo parlour, a body toning salon, a tanning studio, etc. etc. If this interpretation is correct, then there is scope for a very wide range of uses that would previously have been regarded as sui generis.
On the other hand, there have in the past been appeal decisions in which it was held that a ‘weight loss centre’, a ‘body toning salon’, a ‘tanning shop’ and a ‘tattoo studio’ did not come into the category of “other services which it is appropriate to provide in a shopping area”, and it would seem to be entirely possible that planning inspectors might similarly determine in future (as a matter of fact and degree) that such uses do not properly fall within this category and therefore remain sui generis. The resulting ambiguity in the drafting of the new regulations is unfortunate, and is likely to cause difficulty for developers, building owners and the proprietors of businesses and also for LPAs.]
PART B (Local Community and Learning)
Class F.1 Learning and non-residential institutions
Any use not including residential use—
(a) for the provision of education [formerly D1(c)],
(b) for the display of works of art (otherwise than for sale or hire) [formerly D1(d)],
(c) as a museum [formerly D1(e)],
(d) as a public library or public reading room [formerly D1(f)],
(e) as a public hall or exhibition hall [formerly D1(g)],
(f) for, or in connection with, public worship or religious instruction [formerly D1(h)],
(g) as a law court [formerly D1(i)].
Class F.2 Local community
Use as—
(a) a shop mostly selling essential goods, including food, to visiting members of the public in circumstances where—
(i) the shop’s premises cover an area not more than 280 metres square, and
(ii) there is no other such facility within 1000 metre radius of the shop’s location,
[These uses were formerly within A1, and it would appear that they are also capable of falling within new Use Class E, because there is no provision that excludes the uses in new Class F.2 from alternatively, falling within Class E. The ramifications of this apparent confusion will only become apparent as the interpretation of these new provisions is explored in practice.]
(b) a hall or meeting place for the principal use of the local community,
[This use (formerly within D1(g)) would also appear to be capable of falling within new Use Class F.1, because there is no provision that excludes the use in new Class F.2 from alternatively falling within Class F.1. Here again, I have not yet understood the ramifications of this apparent confusion],
(c) an area or place for outdoor sport or recreation, not involving motorised vehicles or firearms [formerly within D2(e)],
(d) an indoor or outdoor swimming pool or skating rink [also formerly within D2(e)]
[So far as an indoor swimming pool or skating rink are concerned, here again, this use would also appear to be capable of falling within new Use Class E (under paragraph E(d)), because there is no provision that excludes the use in new Class F.2 from alternatively falling within Class E. This is another case in which I have not yet understood the ramifications of this apparent confusion.]
You may wonder why, following the abolition of the Use Classes in Parts A and D of the former Schedule to the UCO, the new Use Classes have been designated as E, F.1 and F.2. Well, as Polonius observed, though this be madness, yet there is method in’t. As we shall see below, the former Use Classes that have been removed from the UCO will still have a ghostly after-life. So to avoid confusion with these wraith-like entities, the new Use Classes have been given entirely new designations.
The most significant effect of the recast Use Classes is to produce much larger classes of uses that are covered by each of Parts E and F (Classes E, F.1 and F.2). In accordance with Article 3(1) of the UCO, where a building or other land is used for a purpose of any class specified in Schedule 1 or Schedule 2, the use of that building or that other land for any other purpose of the same class shall not be taken to involve development of the land. This is slightly modified by paragraph (1A), so that (additionally) the use of that building or that other land, or if specified, the use of part of that building or the other land (“part use”), for any other purpose of the same class is not to be taken to involve development of the land. Section 55(2)(f) of the 1990 Act also continues to apply in this context.
So to take a few random examples, a change of use between a retail shop and a restaurant, a bank or building society (or any other kind of office, whether it was formerly in Use Classes A2 or B1(a)), a doctor’s or dentist’s surgery, a light industrial use or a crèche, day nursery or day centre, which are all now with Use Class E, will not constitute development and will not therefore require planning permission. Where any changes of use between these uses was formerly PD under the GPDO those permitted development rights will no longer be required, and any restrictions, limitations or conditions applying to such PD will no longer apply.
In the case of Class F.1, all the uses listed in this Use Class were formerly within Class D1, and so there is no change in that regard, except that the scope for changes of use that do not constitute development is slightly reduced, because the provision of medical and health services and use as a crèche, day nursery or day centre are no longer in the same Use Class (as they now fall within Class E).
The purpose and effect of Use Class F.2 is somewhat puzzling. Quite apart from the overlap of certain ‘community’ uses with similar uses in other Use Classes which I have noted above, it appears to be the intention that a use such as a community hall could have its use changed (in whole or in part) to a community shop, without needing planning permission.
The observations I have set out above represent only my first impression of the new provisions, and there may be other ramifications and unforeseen consequences that I have not yet identified.
Now, excuse me while I wrap a wet towel around my head to prevent my brain from overheating, and I’ll try to explain the transitional, savings and consequential provisions.
First of all, between 1 September 2020 and 31 July 2021, any references in the GPDO to the uses or use classes specified in the Schedule to the Use Classes Order are to be read as if those references were to the uses or use classes which applied on 31st August 2020 (i.e. before the UCO was amended by the current regs). If between those two dates, a prior approval application is made under Part 3 of the Second Schedule to the GPDO, or if an Article 4 Direction is made, modified or cancelled, it is the pre-September 2020 uses, use classes and definitions that are to apply to that application or to that Direction. If an Article 4 Direction is made before 1 September 2020, references in the Direction to pre-September 2020 uses or use classes are to continue to be read as references to those uses or use classes.
In the same way, if a planning application (including an application for PiP or an application for the approval of reserved matters) is made before 1 September 2020, referring to a pre-September 2020 use or use class, that application must be determined by reference to that pre-September 2020 use or use class. (There are one or two other minor transitional provisions which I don’t propose to go into here.)
On the other hand, where a building or other land is being used for the purpose Class A1 (Shops), Class A2 (Financial and professional services), Class A3 (Restaurants and cafes), or Class B1 (Business), that building or other land is to be treated, on or after 1st September 2020, as if it is being used for the corresponding purpose specified in Class E (Commercial, business and service) in Schedule 2.
Most readers are no doubt aware of the provision in Article 3(4) of the UCO which provided that where land on a single site or on adjacent sites used as part of a single undertaking is used for purposes consisting of or including purposes falling within use classes B1 and B2, those classes could be treated as a single class in considering the use of that land for the purposes of the UCO, provided that the area used for a purpose falling within Class B2 was not substantially increased as a result. This provision is now replaced by a similar provision which refers to the use described in Schedule 2, Class E, sub-paragraph (g) and the modified Class B2 in Schedule 1, so that those classes may be treated as a single class in considering the use of that land for the purposes of this Order, so long as the area used for a purpose falling within Class B2, or Class B2 as modified, is not substantially increased as a result.
Now, I must take a deep breath before plunging into the No.2 and No.3 amendment orders to the GPDO, with their interesting new permitted development rights. Such fun!
ADDENDUM: When writing the blog post above, I was focusing on the amendments to the Schedule to the Use Classes Order. I should also have drawn attention to Regulation 7 of the Use Classes amendment regulations. This provides that for the purposes of the Use Classes Order, if a building or other land is being used for a purpose that, on 31st August 2020, fell within any of Use Classes A1 (Shops), A2 (Financial and professional services), A3 (Restaurants and cafes), or B1 (Business), that building or other land is to be treated, on or after 1st September 2020, as if it is being used for a purpose specified within the new Class E (Commercial, business and service).
Thus, those uses that were expressly specified as being within Use Class A1 (such as, among other things, use as a Post Office, as a Travel Agent, for hairdressing, or for the direction of funerals, etc. etc.) will definitely come within Use Class E. I am sorry that I failed to spell this out.
UPDATE (28.8.20): Two minor corrections have had to be made to the drafting of the UCO amendment regs, by the Town and Country Planning (Use Classes) (Amendment) (England) (No 2) Regulations 2020 (SI 2020 No.859) and ditto (No.3) Regs (SI 2020 No.895). The first correction relates to CIL, and preserves references to the Use Classes that applied when an LPA adopted a charging schedule. The second correction relates to a local community shop falling within Use Class F.2. The definition as originally drafted referred to the shop’s premises covering an area not more than “280 metres square”. The corrected version changes this to “280 square metres”.
© MARTIN H GOODALL
Tuesday, 21 July 2020
More changes to the GPDO and to the UCO
As quite a few of you will already be aware, the government has rushed out (just in time before the parliamentary recess) three new statutory instruments, two of which introduce further amendments to the GPDO. The other makes important changes to the Use Classes Order.
None of these changes comes as a surprise, as the government has been promising / threatening these changes for some considerable time. In fact, the only aspect of the timing that calls for comment is the government’s failure to get on with it earlier. These new provisions have had a gestation period that would make an elephant green with envy.
No doubt there will be numerous comments in the press about the new changes, but I would prefer to digest the details before pronouncing on them. I will blog on the new legislation in the next week or two, concentrating primarily on what these changes actually do (as distinct from the grandstanding and hyperbole that is an inevitable accompaniment in today’s government press release).
© MARTIN H GOODALL
Thursday, 16 July 2020
Extension of planning permissions – update
I was asked yesterday when the government might have the legislation in place to extend the time limits on existing planning permissions.
The Business and Planning Bill is being fast-tracked through parliament. The next stage will be the committee stage in the House of Lords (due on 20 July).
My guess is that the government wants to get the Bill to Royal Assent before the summer recess (i.e. by 29 July).
Extension of planning permissions is governed by Clause 17 of the Bill, which will come into force at the end of the period of 28 days beginning with the day on which the Act is passed. So it should be in force by late August.
Extension of an existing planning permission that has not yet been implemented will be automatic if it has not expired by that date. If the permission has expired by that time, it will require an additional environmental approval.
UPDATE: My guess was correct (although I got the date of the beginning of the parliamentary recess wrong, by a week). The Bill got royal assent just before the end of term, on 22 July, so was in force by late August as predicted. The automatic extension of permissions will now end on 1 May 2021. Additonal environmental approval is required only if it is development that required an EIA. The environmental approval is deemed to be granted if the LPA does not determine it within 28 days. The deadline for environmnetal approvals is 31 December, but this could be extended by the Sectretary of State.
© MARTIN H GOODALL